of the intention of the survey. Each took approximately 3-5 minutes to fill out the questionnaire.
E. Analysis techniques
We expect that we could calculate degrees of customer attitudes toward FedEx Kinko’s service from quantitative survey result. And we could make various graphs that show differences, strengths, or TOM according to survey results.
6. Research Findings
hour, and in order to fix this into labor hours per assembly, we divided 1 with 1.3 and got 0.77.
Labor hours per testing: 0.5
Since Labor hours for testing was recorded in the company’s product report so we didn’t have to go through separate calculations.
-42”1/2 and 32”1/2 are big models, and 21.6”1/2 and 18.5”1/3 are small models. Since small models are almost half of
Workforce
Bottleneck at Drying procedure
Overtime Costs & Truck Queue
To solve the problem,
Minimizing the Cost
Remove Truck Queue
Amount of berries
: 75 X 243 = 18225
But, we assumed it is 19000 for easiness of the calculation
Total work time except overtime
: 12 – 1 (for lunch) = 11hrs.
Total amount of wet berries per hour
: (19000 X 0.7
of People who just rest which measured Not economically active population if they calculate youngman(age 15 to 29) is unemployed unemployment is over 6%.
Plus People who work only one hour per week, People who give up getting a job, work under 17 hours per week now unemployment rate is over 10%.
Especially youngman sensory unemployment rate is much more serious this January youngman unemploymen
2. Analysis of project
1) Course of pipeline from knock-out drum on the first floor to storage tank on the third floor.
It is ideal to design pipelines using straight line for economic feasibility and efficiency but that is impossible for the reason of structure of plant. So It is necessary to inspect the structure of plant.
2) What kinds of pipe do we decide?
Considering economi